{"id":2795,"date":"2023-09-04T13:27:58","date_gmt":"2023-09-04T10:27:58","guid":{"rendered":"https:\/\/uplevel.lv\/jaunumi\/the-walls-of-the-houses-are-bricked-and-the-floor-coverings-are-concreted\/"},"modified":"2023-09-04T13:40:10","modified_gmt":"2023-09-04T10:40:10","slug":"the-walls-of-the-houses-are-bricked-and-the-floor-coverings-are-concreted","status":"publish","type":"jaunumi","link":"https:\/\/uplevel.lv\/en\/news\/the-walls-of-the-houses-are-bricked-and-the-floor-coverings-are-concreted\/","title":{"rendered":"The walls of the houses are bricked and the floor coverings are concreted"},"content":{"rendered":"<p>[vc_row el_class=&#8221;mw_1400 post_single_block&#8221;][vc_column][vc_column_text]<\/p>\n<h2 class=\"main__h2\"><b>The walls of the houses are bricked and the floor coverings are concreted<\/b><\/h2>\n<div class=\"textWrap textWrap2\">\n<p class=\"main__text\">According to the work schedule, the construction works of the new housing and the implementation of the project are purposefully implemented every day and move to the next level. After the concreting of the foundations, work was started on the masonry of the walls of long-lasting structures with high strength 5 Mpa Bauroc HARD aerated concrete blocks.<br \/>\n<i><span style=\"font-weight: 400;\">Ilgtsp\u0113j\u012bgo m\u0101jok\u013cu sienas ir veidotas no 1.kategorijas blokiem ar visliel\u0101ko spiedes iztur\u012bbu starp Bauroc izstr\u0101d\u0101jumiem. The walls of sustainable housing are made of 1st category blocks with the highest compressive strength among Bauroc products. Using Doka Latvia latest technology formwork <span style=\"font-weight: 400;\"> <a href=\"https:\/\/www.doka.com\/en\/system-groups\/doka-floor-systems\/timber-beam-floor-formwork\/dokaflex\/index\">#Dokaflex<\/a><\/span><\/i> solution, a monolithic reinforced concrete cover was built, as a result of which the first floor stage of the building frame was completed. <\/span><br \/>\n<span style=\"font-weight: 400;\">Then the work is continued at the next level. When starting the masonry of the walls of the second floor, the window openings were prepared and expanded clay concrete covers were installed. Currently, the walls of the second floor are being completed before the construction of the monolithic reinforced concrete cover.<\/span><br \/>\n<span style=\"font-weight: 400;\">The 1st phase of the project with seven dwellings is expected to be put into operation in the middle of 2024.<\/span><br \/>\n<span style=\"font-weight: 400;\">Follow the project on <a href=\"https:\/\/www.facebook.com\/profile.php?id=100077477873156\">facebook <\/a><\/span><\/i><br \/>\n<span style=\"font-weight: 400;\">Safety and quality &#8211; UPLEVEL HOME priority!<br \/>\n<\/span><\/p>\n<\/div>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row el_class=&#8221;single_post_image&#8221;][vc_column][vc_single_image image=&#8221;2770&#8243; img_size=&#8221;full&#8221;][\/vc_column][\/vc_row][vc_row el_class=&#8221;mw_1400 post_single_block&#8221;][vc_column][vc_column_text][\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row el_class=&#8221;mw_1400 post_single_block&#8221;][vc_column][vc_column_text] The walls of the houses are bricked and the floor coverings are concreted According to the work schedule, the construction works of the new housing and the implementation of the project are purposefully implemented every day and move to the next level. After the concreting of the foundations, work was started on [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2767,"comment_status":"open","ping_status":"closed","template":"","meta":{"om_disable_all_campaigns":false,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"class_list":["post-2795","jaunumi","type-jaunumi","status-publish","has-post-thumbnail","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/uplevel.lv\/en\/wp-json\/wp\/v2\/jaunumi\/2795","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/uplevel.lv\/en\/wp-json\/wp\/v2\/jaunumi"}],"about":[{"href":"https:\/\/uplevel.lv\/en\/wp-json\/wp\/v2\/types\/jaunumi"}],"author":[{"embeddable":true,"href":"https:\/\/uplevel.lv\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/uplevel.lv\/en\/wp-json\/wp\/v2\/comments?post=2795"}],"version-history":[{"count":19,"href":"https:\/\/uplevel.lv\/en\/wp-json\/wp\/v2\/jaunumi\/2795\/revisions"}],"predecessor-version":[{"id":2814,"href":"https:\/\/uplevel.lv\/en\/wp-json\/wp\/v2\/jaunumi\/2795\/revisions\/2814"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/uplevel.lv\/en\/wp-json\/wp\/v2\/media\/2767"}],"wp:attachment":[{"href":"https:\/\/uplevel.lv\/en\/wp-json\/wp\/v2\/media?parent=2795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}